TRAINING PREVENTIVE, PREDICTIVE AND PROACTIVE MAINTENANCE

TRAINING PENGENALAN PREVENTIVE, PREDICTIVE AND PROACTIVE MAINTENANCE
TRAINING SISTEM PERAWATAN
OBJECTIVE
Preventive and predictive maintenance is a maintenance system which
very reliable to prevent some sudden troubles or breakdown that may
happened on factory’s tools/equipments. The sudden troubles are very
potential things that caused a big loss in production process. The
effects of this problem are some failure to achieve production target,
the lack of personnel, unprepared spare parts, etc. Preventive and
predictive maintenance application system starts from standard
arranging, activity planning, realization supervising, and, as the
finish line is, evaluating and analyzing the maintenance’s result.
BENEFIT
After completing this course, participants will be able to :
* Develop, implement and supervise the preventive and predictive
maintenance program
* Economize the time, money and company’s resources by using
sophisticated technique and method in order to optimize the
affectivity of maintenance
* Prevent the company’s equipment and tools from damage and make
the machine’s living period longer
* Decrease the down time
* Increase the profit
COURSE CONTENT
1. Why Preventive and Predictive Maintenance
* Apprising maintenance performance and effectiveness
* Typical maintenance controls
* Reactive maintenance
* Anticipative maintenance
* Ascertainment of equipment condition
* The need for preventive maintenance
* Why preventive maintenance
* Preventive predictive maintenance objectives
* Preventive predictive maintenance prerequisites
* Preventive maintenance feasibility analysis
* Policies
* PM program functions
* Cost impact
* Saving potential
2. Developing The Preventive Predictive Maintenance Program
* Assignment of organizational responsibilities typical maintenance
functional assignments operational concepts
* Equipment to be included
* Equipment inventory sheet examples
* Equipment numbering concepts
* The PM work order
* Developing the inspection sheet
* ECS rating sheet as cross reference
* Sample of equipment components
* Spare parts and material needs
* Inspection sheet examples
* Determining the frequency cycle
* Frequency cycle examples
* Scheduled frequency overview
* Developing job safety practices typical examples
* Considering manual versus computerization
* Predictive maintenance can determine maintenance requirement
* Predictive maintenance and its applied techniques as part of the
PM program
* Vibration analysis
* Wear particle analyzing
* Thermography
3. Implementation of Preventive Maintenance Program
* Job planning
* The planning function
* Planning, service to do
* Job planning prerequisite
* Planners qualifications
* Duties and responsibilities of planners
* The hob package
* Line supervisors qualifications
* Planning permits us, to forecast, communicate and measure
* What job should be planned
* Time required to perform work labor content
* Standard defined
* Consistency of estimating
* Estimating methods
* Work backlog
* Scheduling of maintenance work
* PERT and CPM as scheduling tools
* Loading of the PM work order
* Load leveling
* Weekly scheduling
* Manpower requirements forecasting
* Forecasting by crew
* Forecasting by department
* Weekly schedule computer and manual example
* Training of personnel
4. Controlling The Preventive Predictive Maintenance Process
* Preventive maintenance administration
* Planned maintenance
* Special tools and equipment
* Service user coordination
* Equipment availability
* Service user notification examples
* Automotive notification examples
* Control reporting
* What should be included
* Schedule for supervisor
* Schedule for supervisor service user
* Overdue for maintenance and service user
* Missed PM report for maintenance and service user
* Complete PM’s
* Summary report of all PM’s completed
* Listing of all PM’s set-up in program
* Planning and scheduling index example
* Assurance of work performed
* Conformance and auditing
* Feedback evaluation/corrective action cycle
5. Examining Results
* Effectiveness of the preventive maintenance program
* Refining the PM program
* 3 Correlating preventive maintenance to breakdown maintenance
* Measuring and appraising the PM program
* Equipment history
* Analyzing equipment failures
* Some relevant maintenance control indices
PARTICIPANTS
This special course is designed for manager, supervisor, engineer,
planer, foreman, and technician. Also, for those who are in
operations, engineering and purchasing division and who would like to
acquire an understanding of how the quality of the maintenance
function affects their function.
Â
TRAINING METHOD
Presentation
Discussion
Case Study
Evaluation
JADWAL TRAINING TAHUN 2023
17 – 18 Januari 2023
14 – 15 Februari 2023
20 – 21 Maret 2023
4 – 5 April 2023
16 – 17 Mei 2023
20 – 21 Juni 2023
17 – 18 Juli 2023
15 – 16 Agustus 2023
25 – 26 September 2023
17 – 18 Oktober 2023
21 – 22 November 2023
27 – 28 Desember 2023
Metode Training
- Tatap Muka/offline
- Online via zoom
Kota Penyelenggaraan jika offline :
- Bandung
- Jogjakarta
- Surabaya
- Jakarta
fasilitas yang didapatkan
- Training Kit Eksklusif
- Tas
- Name Tag
- Modul
- Flash disk
- Ballpoint
- Block Note
- Souvenir
- Harga yang Reliable
- Trainer Kompeten di bidangnya
- Pelayanan Maksimal untuk peserta
- Penjemputan dari dan ke bandara
Investasi :
Public training : Rp. 4.500.000 (minimum 3 pax)
In House Training : on Call